Five suppliers, five formats, one comparison

Send the material list once. As quotes come back — a PDF, a spreadsheet, a price typed into an email — they get read into one table you can actually compare, with lead times next to the numbers.

Framing package — Halloway Ave

4 of 5 replied

2x10 SYP #2, 16ft — 240 pieces

  • Ridgeway Building Supply

    3 days$8,904
  • Coastal Lumber Co

    next day$9,120
  • Fielder & Sons

    8 days$9,235
  • Trade Depot

    in stock$9,860

Cheapest on this line isn't cheapest on the package — Coastal wins on three of the other six.

Works with

  • Gmail
  • Outlook
  • Google Sheets
  • Excel
  • Google Drive

Quotes come back however each supplier sends them — attached PDF, spreadsheet, or a price typed into the body of an email. It reads all three out of your inbox.

The chore

How this goes right now

  1. You've got a takeoff done and seven line items to price. You email three or four suppliers, or you ring them, which is worse because then there's no record of what you asked for. Over the next three days the replies drift in.

  2. One sends a tidy PDF. One sends a spreadsheet with their own part numbers and no descriptions you recognise. One replies to your email with the prices typed in the body, in a different order from your list. One quotes you for 2x10s when you asked for 2x12s and doesn't mention it. One never replies at all and you don't notice until you've already ordered.

  3. Comparing them properly means an hour at a kitchen table with a legal pad, and you have that hour available approximately never. So you order from whoever came back first with a number that looked fine, and you tell yourself you'll compare properly next time.

The difference

It's not that comparing is hard. It's that it takes an hour you don't have.

Pricing by whoever replied first
Pricing off one table
Every supplier quotes in their own format and order
One RFQ, identical wording, everyone gets the same list
Substituted items slip through unnoticed
Replies read into a single table regardless of format
Lead times mentioned in passing, never compared
Substitutions flagged rather than quietly priced
No record of who was asked or when
Lead time sits next to the price, where it belongs
The comparison never gets done, so first reply wins
Suppliers who never replied are visible, not forgotten

Try it

Walk through it yourself

This is the actual shape of the workflow — the same trigger, the same steps, the same draft waiting for your say-so. Click through it.

Compare supplier quotes

You start itGoogle Sheets

Material list ready to price

Framing package for the Halloway Ave duplex — seven line items, takeoff finished this morning. You tell it to go.

What it does

  1. Read the material list off your takeoff

    Seven lines: 2x10 SYP #2 16ft ×240, LVL beams ×4, joist hangers ×180, sheathing, sill plate, fasteners, and a bundle of blocking.

    Google Sheets
  2. Send one identical RFQ to five suppliers

    Same list, same wording, same deadline — Friday noon. Nobody gets a slightly different spec to quote against.

    Gmail
  3. Read the replies as they arrive, whatever the format

    Two PDFs, one spreadsheet, one price list typed into an email body. Fielder & Sons quoted #1 grade where the list said #2.

    Gmail
  4. Line them up on the same rows

    One table, seven rows, four columns of prices — plus a flag on the grade substitution and a note that Trade Depot never replied.

    Google Sheets

Draft comparison — nothing has been sent

Framing package comparison — Halloway Ave
Line itemRidgewayCoastalFielderTrade Depot
2x10 SYP #2 16ft ×240$8,904$9,120$9,235 ⚠$9,860
LVL beam 1.75×11.875 ×4$1,640$1,512$1,588$1,720
Joist hangers ×180$486$441$502$470
Sheathing 7/16 OSB ×96$2,304$2,208$2,352$2,410
Package total$13,334$13,281$13,677$14,460

Coastal is $53 cheaper overall and next-day rather than three days. Fielder's headline number is only competitive because they quoted #1 grade against a #2 spec — that line isn't comparable and shouldn't be read as a saving.

Order the package from Coastal, or query Fielder on the grade first?

Querying drafts a short note back to Fielder asking them to requote on the specified grade. Worth doing when the difference is big enough to change the answer, which here it isn't quite.

Once you approveGoogle Drive

The comparison gets saved against the job

The table and all four original quotes are filed in the job folder. When someone asks in August why you paid what you paid, the answer is a document rather than a memory.

That's the whole workflow.

It drafts, you approve, nothing sends on its own.

Start free

How it works

What it's actually doing

You start this one — it isn't triggered by anything. The work is in the reading, not the sending.

  1. 1
    • Gmail
    • OuOutlook

    It sends one list, worded identically

    Everyone gets the same spec, the same quantities and the same deadline. Half the reason quotes are hard to compare is that they were answering slightly different questions, and that starts with how the RFQ went out.

  2. 2
    • Gmail
    • Google Drive

    It reads whatever comes back

    A PDF, an attached spreadsheet, or prices typed into an email. It pulls the numbers out and matches each one to a line on your list, including when the supplier renamed it or put it in a different order.

  3. 3
    • Google Sheets

    It flags what isn't comparable

    This is the part worth paying attention to. A supplier quoting a different grade, size or quantity looks cheaper on the page and isn't. Those lines get marked rather than averaged into a total that would mislead you.

  4. 4
    • Google Sheets
    • ExExcel
    • Google Drive

    It builds one table and shows its working

    Same rows, one column per supplier, lead times alongside. Every original quote stays attached, so you can check any number against the document it came from rather than trusting the transcription.

You stay in control

It reads and lines up. You choose who gets the order.

Nothing here places an order or commits you to a supplier. It does the hour of transcription you were never going to do, and hands you a table. Which supplier gets the work — and whether the cheapest one is the right one — is a judgement involving relationships and reliability it can't see.

  1. Step one

    It drafts

  2. Step two — you

    You read it and approve

  3. Step three

    Only then does it send

It never places an order

No purchase orders, no commitments, no calls. The output is a comparison. Ordering happens the way it always has, from whoever you decide.

The RFQ waits before it goes

You see the list and the supplier set before anything is sent. Adding a supplier, dropping one, or changing the deadline is done before it leaves.

Every number traces to a document

Each figure links to the quote it was read from. Where a number is ambiguous — a handwritten scan, a price with unclear units — it says so rather than picking a value.

It doesn't tell you who to buy from

It'll point out that the cheapest package isn't the cheapest line, or that a lead time doesn't fit your schedule. It won't recommend a supplier, because it doesn't know which one answers the phone when you're stuck on a Friday.

Setup

What setting this up involves

  1. 1

    Connect

    • Gmail or Outlook, to send the RFQ and read the replies
    • Google Sheets or Excel, where your takeoff and the comparison live
    • Google Drive, to file the original quotes
  2. 2

    Tell it how you work

    • Your supplier list, and which ones to ask for which materials
    • How long they get to reply — Friday noon is a common answer
    • Whether substitutions are ever acceptable, and for what
    • How your takeoff is laid out, so it reads the right columns
  3. 3

    Then it runs

    About 25 minutes, once

    Most of it is entering the supplier list and who to ask for what. After that, pricing a package is one instruction rather than an evening.

Edge cases

Where it's careful, and what it won't do

What it handles

  • Suppliers who quote a substitution

    The most common way a comparison goes wrong. A different grade, a metric size against an imperial spec, a 92-5/8 stud against a 8ft one — all of them look cheaper. Those lines are flagged as not comparable rather than counted.

  • Partial quotes

    Suppliers frequently price four of your seven lines and ignore the rest. The table shows the gaps as gaps, and the package total is only calculated across lines everybody quoted, so you're never comparing a full package to a partial one.

  • Prices that expire

    Lumber quotes often hold for a week or less. Where a quote states a validity period it's recorded against that column, and the comparison notes when the earliest one lapses.

  • The supplier who never replies

    Silence is easy to miss when three other quotes arrived. Anyone who hasn't answered by the deadline appears in the table as no reply, so you know whether you're choosing from five or from three.

What it does not do

  • It doesn't do the takeoff

    Quantities and specifications come from you. Measuring off drawings is not what this is, and a material list generated from a guess would be worse than useless.

  • It doesn't negotiate

    No going back to Ridgeway with Coastal's number. That conversation is yours, and it's usually a phone call between people who've done business for years.

  • It doesn't check stock

    Lead times come from what the supplier wrote in the quote. It has no connection to anyone's inventory system and won't tell you what's actually on the yard this morning.

  • It doesn't rank suppliers

    No scores, no preferred-supplier logic, no history-based recommendation. It shows you the numbers side by side and stops there.

Time back

Four to six hours a month, and two to three per cent on materials

Time back
Four to six hours a month, and two to three per cent on materials
Spent on
The work that bills

How that’s worked out: Based on pricing three or four packages a month at roughly 60–90 minutes each to chase, transcribe and compare properly. The percentage comes from actually comparing rather than ordering from the first reply — on $30,000 of monthly material spend that's $600 to $900, which is the part that matters more than the hours.

Fair questions

The things contractors ask first

I've used the same lumber yard for fifteen years.

Then this is worth less to you, and you should weigh that honestly. What it still gives you is a check — pricing a package against two others once a quarter tells you whether the relationship is costing you anything. Plenty of contractors find it isn't, and that's a useful thing to know rather than assume.

Suppliers hate being put in a bidding war.

They hate a race to the bottom. Being asked to price a clearly specified list against a stated deadline is just how buying works, and it's easier for them than a vague phone call. The RFQ doesn't tell anyone they're being compared or show them another supplier's number.

Can it really read a scanned PDF quote?

Usually, including most scans. Where a figure is genuinely unclear it flags that line rather than guessing, and every number links back to the document it came from so you can check it in one click. On a handwritten fax — and these still exist — expect to check more of them.

FAQ

Questions worth answering properly

What formats can it read quotes in?

PDF attachments, spreadsheets, and prices typed into the body of an email — which between them covers nearly everything suppliers actually send. Scanned PDFs usually work too. Anything it can't read confidently gets flagged rather than guessed at.

How does it handle a supplier quoting something different?

It flags the line as not comparable and says what changed — grade, size, quantity. This is the single most valuable thing it does, because a substitution is what makes a quote look cheapest when it isn't, and it's the easiest thing to miss at eleven at night.

Does it place the order?

No. It produces a comparison and files the original quotes. Ordering stays entirely manual — it doesn't raise purchase orders or contact suppliers to commit to anything.

What if only two suppliers reply?

You get a comparison of two, with the non-repliers shown as no reply. That's deliberate — knowing you're choosing between two rather than five changes how much confidence to put in the answer.

Can it compare on lead time as well as price?

Lead time sits next to each price in the table. It won't weigh the two for you, because whether three days beats fifty-three dollars depends on your schedule that week, and only you know that.

Are the original quotes kept?

Yes, filed in the job folder alongside the comparison. Every figure in the table links back to the document it came from, so you can verify anything without trusting the transcription.

Stop buying from whoever replied first

Connect your inbox and point it at a takeoff. The next package you price comes back as one table instead of five emails.